360° OEM Assembly Solutions — 8 Suppliers Consolidated to 1

A global OEM was managing 8 separate suppliers for the components of a single sub-assembly. 8 purchase orders. 8 delivery schedules. 8 quality checks on receipt. And when something was wrong at assembly, 8 suppliers pointing at each other. Amsol took over the complete sub-assembly — everything under one PO.

Key Outcome
The OEM's procurement team went from managing a fragmented multi-supplier programme to placing a single purchase order for a complete, inspected, assembly-ready sub-unit.
The Situation

The Real Cost of a Multi-Supplier Sub-Assembly Programme

The hidden cost of managing 8 suppliers for one product line is rarely calculated. Every incoming delivery needs a quality check. Every mismatch between component tolerances from different suppliers needs an investigation. Every late delivery from one of 8 suppliers stops the assembly line.

And when the assembly fails — when the machined shaft does not fit the bore of the casting because two suppliers interpreted the same drawing differently — there is no single partner to call. Just 8 suppliers, each explaining why it was not their fault.

The Problem
What the OEM was facing.
8 purchase orders for 8 components in one sub-assembly — management overhead
8 incoming quality inspections on receipt — each requiring time and resource
Split tolerance accountability: no single partner owns the interface between components
Delivery risk multiplied ×8 — one late supplier stops the entire assembly
When assembly fails — 8 suppliers available, zero accountability
Amsol's Approach
The engineering-led solution.
Amsol took on the complete sub-assembly programme across all 8 component types
All components sourced or manufactured through Amsol's 13-process network
Amsol owns all inter-component tolerance interfaces — fit guaranteed before despatch
One PO, one delivery, one quality check — complete assembled unit inspected at Amsol
One point of accountability — one call to Amsol covers any quality or delivery issue
What Amsol Did

What the Sub-Assembly Contained — 7 Components, 1 Amsol PO

The sub-assembly required components across five different manufacturing processes. Before Amsol: 8 suppliers, 8 POs, 8 deliveries. After Amsol: 1 supplier, 1 PO, 1 delivery.

Component 01
Cast Iron Housing
Shell mould casting + CNC machining — bearing interfaces to H7
Component 02
Precision Ground Shaft
EN24 steel · CNC turned + cylindrically ground to h6
Component 03
Forged Structural Bracket
Closed die forging + CNC machining — structural load interfaces
Component 04
Injection Moulded Cover
PA66+GF30 · precision tooled · assembly fit validated at Amsol
Component 05–07
Bearing Housing + Fastener Kit + Final Assembly
Shell mould + CMM bore · sourced and kitted · assembled, inspected, labelled to OEM standard
Result
1 PO. 1 Delivery. 0 Assembly Issues.
Complete sub-assembly inspected at Amsol before despatch — ready to install on arrival
"
The most expensive thing in a multi-supplier sub-assembly programme is not the components. It is the management overhead, the split quality accountability, and the production line stoppage when two suppliers disagree on whose tolerance was wrong. Amsol removes all three.
Amsol Engineering Team
The Results

What the Programme Delivered

Every result below is documented and traceable to this supply programme.

8→1
Suppliers Consolidated
8 purchase orders, 8 delivery schedules, and 8 quality checks became 1 of each
1 PO
Complete BOM
Every component in the sub-assembly covered by one Amsol purchase order
Zero
Split Accountability
Amsol owns all inter-component tolerance interfaces — one call resolves any issue
Active
Programme Running
Ongoing consolidated supply programme — OEM procurement team managing 1 relationship instead of 8
Multi-Supplier Programme
Managing Multiple Suppliers for One Product?
If your procurement team is managing multiple suppliers for the components of a single assembly — Amsol can assess whether consolidation is possible. Share your BOM and we will map every component to an Amsol process within 5 days.